3 LEVEL 3 · HOW WE WORK

Think. Make. Install.

It's our name, and it's the order we work in. Nothing moves to the next stage until you've signed off the last.

STAGE 1 Think
STAGE 2 Make
STAGE 3 Install
LAUNCH CONDITION: this page goes live only once the approval form, location file template and sample check sheet are standard on every job.
Think
T1

Site walk and brief.

We look at who uses the space and how they move through it, and record every location on site.

T2

Design system.

One visual language across every sign, from the lobby directory to the back-of-house door.

T3

Mockups and 3D sketches.

You see it before it's priced, so the quote matches what gets built.

T4

Master list and location file.

Every sign, every size, every location, in one document.

✓ YOU APPROVE The design system, master list and location file, in writing.
Make
M1

Specs to our fabrication bench.

We draw them. Fabricators we've worked with across past projects build them.

M2

Samples checked against spec.

Materials, colours and finishes confirmed before full production.

✓ YOU APPROVE The samples, in writing.
Install
I1

Supervised on site.

Our team is there when it goes up, not just the installer.

I2

Checked against the location file.

Every sign where it was agreed.

I3

Handover pack.

An as-installed record and a care guide for your facilities team.

What you get

Master list
Design system
Location file
Handover pack
PLACEHOLDER: redacted samples once templates exist

Working with your team

We work to your ID's finishes and design intent.

Statutory signage is designed within the requirements and checked with your consultants.

You see everything before it's built.

Already have a fabricator?

We can design only. You get a fabrication-ready package: design system, drawings, specs, master list and location file. We can also check samples and the install on site.

The questions we're asked first.

Can we trust you with the whole job?

One accountable team from the first drawing to handover, and a developer who came back for project after project.

Masteron: launch to finished buildings →

Will it look like the brand we sold?

We carry your brand past the logo, into lobbies, floors and back of house.

Mosaic: a colour for every floor →

When should we bring you in?

As early as you can. Every job starts somewhere different, but the earlier we're in, the less the signage has to work around.

Tell us your project stage →

Will it fit our programme?

Written sign-off at every stage, one master list of every sign, and a handover pack at the end.

Can we compare your quote fairly?

Design is priced as its own phase, so fabrication is quoted on what will actually be built.

Invite us to tender →

Tell us your project stage.

We'll tell you where we'd start.

TENDER Have a tender out? Send us the documents and the closing date.
Invite us to tender →